You are reading

Sweeping View, Boat Launch And More Planned For Complete Hunters Point South Park

Rendering

Rendering

June 2, 2015 By Jackie Strawbridge

A stretching East River overlook, quiet curving walking paths, a boat launch and a toddler play area are some of the many design elements that will be packed into the complete Hunters Point South Park.

The construction of Hunters Point South Park – like that of the residential developments it accompanies – was split into two phases. Phase I of the park stretched from 50th Avenue to 54th Avenue along the waterfront and opened in 2013.

Phase II will stretch from 54th Avenue to Newtown Creek. Construction is slated to begin in late summer or early fall and to finish in 2018, according to the City Economic Development Corporation, which is implementing the project.

Thomas Bosley

Thomas Balsley

Architect Thomas Balsley presented the Phase II design to a largely receptive crowd of about 20 people at a Hunters Point Parks Conservancy meeting on Monday.

For Balsley, one of the park’s most exciting elements will be a curving overlook that stretches 35 feet over the East River, for what he called an “exhilarating” view of the Manhattan skyline.

“It’s the coolest thing ever,” Balsley said. “It’s just you, and the river, and the sunset, and the Manhattan skyline. It’s extraordinary. It’s like you’ve just taken off in an airplane – you’re floating up there in the air.”

The overlook will be adjacent to Center Boulevard at 57th Avenue. It will be 40 feet wide and protected by metal railings on its sides and a glass railing at its end.

“You really could have a tremendous party out there,” Balsley said. “We predict it is going to be the most sought-after wedding photo location in all of New York.”

According to Balsley, the second phase of Hunters Point South Park is designed to be more “contemplative” and “intimate” than the first, which featured playgrounds, a sports field and a dog run. For Phase II, architects focused on a series of paths, at different elevations and with different views, to give pedestrians quiet space to walk, sit or escape the city streets.

A shady peninsula between 54th and 55th Avenues will jut into the East River, culminating in a proposed public art piece called “Phases of the Moon.” It will feature seven stone discs that will glow subtly at night.

“Phases of the Moon” will be a permanent piece requiring “really no maintenance to it at all,” Brigid Keating of the NYCEDC said.

A small toddler-centered space will sit at the top of a narrow park lining 55th Avenue between 2nd Street and Center Boulevard. The grassy area will hold swings and climbing structures.

For the most part, Balsley said, kids’ play space was not a major focus of Phase II since it was designed into Phase I.

A boat launch will also be built next to 2nd Street over Newtown Creek, from which visitors can take out their kayaks or sit on the edge and dip their feet in the water.

Balsley’s description elicited a gasped “yes!” from the audience. One listener, however, was worried about the lack of boat storage space at the launch, which she called “shortsighted.”

Another concern raised at the meeting involved public bathrooms, which are not proposed for Phase II. According to Keating, the bathrooms that were built with Phase I at LIC Landing will serve the entire park.

In response to an audience member who felt these restrooms would not be sufficient, Keating said the EDC would address the issue with the Parks Department.

The park will be ADA accessible, with the exception of a terrace with stairs that makes up roughly one percent of total park area, Balsley estimated.

HPPC President Rob Basch said that he felt positive about the design plan, although he also urged for an additional bathroom in Phase II.

“I wish it was 2018 already, I wish it was done,” Basch said. “It’s something that’s going to be great for Long Island City, and the sooner the better.”

A presentation of the design plan is available at hunterspointsouth.com under the “Events” page.

Those who wish to make comments on the design can do so through the HPPC, which can be reached at [email protected]

Phase 2 HPS overlook HPS_PromontoryPlan_0090611_site plan.ai

email the author: [email protected]

4 Comments

Click for Comments 

Leave a Comment
Reply to this Comment

All comments are subject to moderation before being posted.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Recent News

Gunman who fired shots at the Ravenswood Houses in Long Island City remains at large: NYPD

Police from the 114th Precinct in Astoria and PSA 9 are continuing their search for a gunman who allegedly opened fire at the Ravenswood Houses in Long Island City last month.

The incident occurred during the early morning hours of Wednesday, Jan. 18, when officers responded to a 911 call and a ShotSpotter activation for multiple shots fired at 21-25 35 Ave. at the Ravenswood Houses NYCHA complex just after 2 a.m., according to authorities.

Popular places where you can watch the Super Bowl in Queens

Feb. 2, 2023 By Tammy Scileppi

Hey, football fans! Game time is fast approaching, and across the city and here in Queens, you can feel the excitement brewing as the two teams prepare to take the field on Super Bowl Sunday, Feb. 12. So, kick back and watch the big game, and don’t miss Rihanna’s exciting performance during halftime. 

Borough president hears from community members on budget needs throughout Queens

During a two-day public hearing on the mayor’s 2024 preliminary budget, Queens Borough President Donovan Richards Jr. listened to testimonies from 14 community board representatives, community stakeholders and members of the public on where the money should be spent in Queens. 

The public hearings were held both in-person and via Zoom on Monday, Jan. 30, and Tuesday, Jan. 31, at Queens Borough Hall. The testimonials will be used to develop the Queens Borough Board’s FY24 preliminary budget priorities in the coming weeks. 

‘He didn’t deserve to die’: Borough President Richards leads emotional candlelight vigil for Tyre Nichols

Queens Borough President Donovan Richards held a candlelight vigil for Tyre Nichols outside Queens Borough Hall Monday, Jan. 30 after Nichols’ death at the hands of police officers in Memphis, Tenn., made national headlines for the brutality in which the officers beat him.

Almost immediately after news broke about Nichols’ death, the Memphis police officers who beat him to death were fired and charged with murder. The police department released the body cam footage of the fatal beating on Jan. 27, but many people, including some at the vigil, have refused to watch it due to its extremely graphic nature.

Long Island City teen sentenced in fatal shooting of ‘beloved’ school teacher at Queensbridge Houses in 2020: DA

A Long Island City man on Friday, Jan. 28, was sentenced to 19 years in prison for the 2020 fatal shooting of a public school social studies teacher who was out walking his dog when he was caught in the crossfire during a confrontation between gang rivals in broad daylight, just blocks from his home, according to Queens District Attorney’s office.

Ike Ford, 19, of 12th Street, in Long Island City, pleaded guilty to manslaughter in the first degree before Queens Supreme Court Justice Kenneth Holder. The teacher, George Rosa, 53, was shot in his abdomen by a stray bullet fired by Ford, who was just 17 years old at the time of the shooting but was sentenced as an adult given the severity of the crime, according to Queens District Attorney Melinda Katz.