You are reading

DOT to Complete Queens Boulevard Redesign by November: Mayor

Mayor Bill de Blasio announces that fourth and final phase of the Queens Boulevard redesign will be completed by November (Screenshot)

May 13, 2021 By Allie Griffin

The final stretch of the Queens Boulevard redesign will be completed before the end of the year, Mayor Bill de Blasio announced today.

The Department of Transportation (DOT) will finish the fourth and final phase of the redesign in November — about three years behind schedule. Construction, de Blasio said, is expected to begin in July.

The project, which aims to make the boulevard safer for cyclists and pedestrians, has faced continuous delays. It initially faced resistance from Community Board 6 and Council Member Karen Koslowitz and then there were construction delays due to COVID-19.

The plan calls for a revamp of Queens Boulevard from Yellowstone Boulevard to Union Turnpike. It involves the installation of protected bicycle lanes, shortened pedestrian crossings and other traffic safety features. The plan does involve the loss of about 200 parking spots.

The final phase of the Queens Boulevard redesign is scheduled to be completed before the end of 2021. The redesign will go from Yellowstone Boulevard to Union Turnpike in Kew Gardens (Photo: Queens Post)

The overhaul is the final phase of the 7.5-mile redesign of Queens Boulevard, from Sunnyside to Kew Gardens, that began in 2015.

The thoroughfare has been called the “Boulevard of Death” for decades for the notoriously high number of cyclist and pedestrian deaths along it.

Pedestrian injuries decreased by 55 percent and total crashes dipped by 19 percent after the first three phases of the redesign were completed, according to DOT data.

Construction of Phase 4 was supposed to begin in the summer 2018 — but the work was pushed back to summer 2020 and now again to summer 2021.

The final phase has been repeatedly delayed due to opposition from the local community board and Council Member Karen Koslowitz, who said the loss of parking spots would hurt small businesses along the boulevard.

Community Board 6 voted against the plan in 2018, also citing the loss of parking spaces.

Koslowitz put forward an alternative plan in February 2020, which de Blasio agreed to review. Her plan, she said, would save the parking spots. Transit advocates, however, said her plan was not as safe as the DOT’s redesign.

De Blasio said today that the DOT is sticking to its original plan, not Koslowitz’s.

“The council member I think honestly felt that what she was proposing was a better approach for the community and we truly carefully listened to her, thought about, looked at but came to the conclusion that it wasn’t workable and that the original plan was fair,” he said. “I think there were some adjustments made, but it’s based essentially on the original plan.”

Phase 4 of the redesign goes from Yellowstone Boulevard to Union Turnpike. The redesign of the boulevard began in 2015 in Sunnyside (DOT)

De Blasio said that construction was expected to take place last year but COVID-19 struck.

“The last stage, the fourth stage of the Queens Boulevard redesign was getting ready to go and then COVID hit,” de Blasio said. “There was an issue with federal approval, [but] we believe now there’s a much better environment in Washington.”

The plan needs to be reviewed by the State Department of Transportation and the Federal Highway Administration before the DOT can move forward with construction.

De Blasio said that with a different administration in the White House and COVID-19 on the decline, he expects construction to begin in July.

“We need these last approvals… but we are ready to go, and look forward to starting in July and being done in November,” de Blasio said.

Bike and pedestrian safety advocates applauded the announcement, but said it was long overdue.

“We are very pleased that Mayor de Blasio has announced that the next phase of Queens Boulevard will be completed by the end of 2021 — but it should never have taken this long in the first place to transform the Boulevard of Death,” said Danny Harris, Executive Director of Transportation Alternatives.

“New York City is on track to have the second-deadliest year on our streets since Vision Zero began, and Mayor de Blasio and our next mayor must bring the same life-saving street designs for Queens Boulevard to corridors across the five boroughs without delay. This includes extending the project on Queens Boulevard all the way to Hillside Avenue as was initially proposed.”

DOT installing Phase Three of the Queens Boulevard Redesign (DOT)

email the author: news@queenspost.com

One Comment

Click for Comments 
Betty

I honestly can’t believe they made 2 bike lanes and took away so many parking spots to neighborhoods that use bus and car service or work in the auto industry. We get terrible MTA service on the outskirts. All for the 10 cyclists that use the lanes in the warmer months. Thanks, Bike Lobby group for screwing the working class.

Reply

Leave a Comment
Reply to this Comment

All comments are subject to moderation before being posted.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Recent News

Fall fun in western Queens: Your guide to the best seasonal events

Aug. 29, 2025 By Jessica Militello

With beach days and summer BBQs behind us, the start of September rings in the start of magnificent Fall foliage, Halloween and more fun activities that come with the start of Autumn, including a list of Fall events in the area. From apple picking to seasonal ciders and more, there is tons to explore in the community. From Mystic Markets to scary movie meet-ups and more, here is a list of Fall events you do not want to miss.

MTA opens three new modernized elevators at the Queens Plaza subway station in Long Island City

The Metropolitan Transportation Authority (MTA) announced the opening of three new modernized elevators at the Queens Plaza E/M/R subway station in Long Island City earlier this month as part of a larger accessibility and safety upgrades throughout the transit system.

The work included a full replacement of the cab and equipment within the cab, shaft and pit, along with two new elevator head houses located at street level. Crews also made modifications to the shaft and pit as needed to allow for new equipment. The elevator machine room and electrical and mechanical equipment received replacements and other modernization efforts for reliability.

Queens Together launches ‘Unofficial US Open Dining Guide’ encouraging fans to sample restaurants along the 7 line

Aug. 20, 2025 By Shane O’Brien

The US Open returns to Flushing Meadows Corona Park this Sunday, with more than 1 million attendees anticipated to take mass transit to the iconic annual tennis event. With hundreds of thousands of fans set to take the 7 out to the Billie Jean King National Tennis Center, there is a world of delicious local eateries lying beneath the elevated train tracks should any fan wish to stop en-route to the US Open.