You are reading

City Inspecting Ventilation Systems at Classrooms Ahead of Schools Reopening

Mayor Bill de Blasio and Chancellor Carranza toured Village Academy in Far Rockaway to observe how the school is preparing for a socially-distanced reopening on August 12. (Ed Reed/Mayoral Photography Office)

Aug. 26, 2020 By Allie Griffin

The city began inspecting air ventilation systems at classrooms Tuesday, with less than three weeks before public schools reopen, Mayor Bill de Blasio announced yesterday.

Every classroom and space inside a school building will be inspected by a team of independent engineers, joined by the Department of Buildings and FDNY employees. The team will assess each space and determine if there is adequate ventilation based on CDC and WHO guidelines.

Thorough air ventilation is necessary to limit the spread of COVID-19 indoors, experts say. Both air filtration and fresh air through open windows help.

For weeks, teachers and school administrators have worried about how a lack of proper air circulation at older school buildings puts them at greater risk of contracting the virus.

De Blasio said Tuesday that the special teams will ensure that both mechanical and natural air circulation and ventilation systems are in place prior to reopening. They will repair and supply exhaust fans, ensure windows can be opened, and employ high-efficiency filters.

The Department of Education (DOE) will place 10,000 portable air purifiers in school buildings by the first day of class, Sept. 10. The air purifiers will be place in nurses’ offices and isolation rooms and later added to other rooms as needed.

Any room that doesn’t have adequate ventilation will not be used until it is made safe, Schools Chancellor Richard Carrazana said.

The inspections will be completed by Sept. 1 and the results will be shared publicly on a rolling basis, beginning this week through Friday, Sept. 4.

“We’re leaving no stone unturned when it comes to our school buildings, and a robust approach to ventilation is a critical piece of our health and safety plan,” Carranza said. “The science is clear: well-ventilated buildings are safer buildings — and we’re going to make sure that’s true for every school by the first day.”

City public schools are set to reopen Sept. 10 with a blended model of in-person and remote learning.

email the author: news@queenspost.com
No comments yet

Leave a Comment
Reply to this Comment

All comments are subject to moderation before being posted.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Recent News

JetBlue unveils $100M Terminal 5 transformation at JFK Airport

New York’s hometown airline unveiled its plans to revitalize its flagship terminal at JFK Airport, which will undergo a $100 million extreme makeover over the next two years aligning with the Port Authority’s massive $19 billion overhaul of the international airport and its road network.

Long Island City-based JetBlue announced the overhaul at Terminal 5, which will feature more than 40 new concessions and amenities, including art installations and a redesigned center concourse. The terminal, which is managed by Fraport USA, will open throughout this year, and the terminal improvements will be completed by the end of 2026.

Queens TV actor convicted of 2021 St. Albans murder in real-life crime drama: DA

A TV actor from Rego Park is facing 25 years to life in prison after he was convicted of murder by a jury following a two-week trial in Queens Supreme Court on Friday.

Isaiah Stokes, 45, of 62nd Road, was found guilty of the fatal 2021 ambush shooting of 37-year-old Tyrone Jones in St. Albans on Feb. 7, 2021, as he sat in a parked Jeep Grand Cherokee, waiting for a friend to arrive for lunch at a nearby restaurant.